All projects
Bathrooms
Full Bathroom Refit
A dated 1990s bathroom stripped back to brick and rebuilt with a walk-in shower, wall-hung WC and backlit vanity.
Location
Northside
Duration
9 days
Project value
$14,800
Completed
The brief
The homeowners wanted a bright, low-maintenance family bathroom with a walk-in shower and plenty of storage.
What we did
We stripped the room back to brick, re-routed the waste, installed a concealed thermostatic valve and laid electric underfloor heating before tiling floor to ceiling.
The result
A spa-style bathroom with a backlit vanity, wall-hung WC and frameless glass — finished on schedule in nine working days.
Planning something similar?
Book a free survey and get a written, fixed-price quote within 48 hours.
More recent projects

Bathrooms
Full Bathroom Refit
Northside
•
9 days
A dated 1990s bathroom stripped back to brick and rebuilt with a walk-in shower, wall-hung WC and backlit vanity.
View project

Boilers
System Boiler Upgrade
Riverside
•
2 days
An inefficient 20-year-old boiler and tank replaced with a high-efficiency system boiler, new valves and a full system flush.
View project

Bathrooms
Thermostatic Shower Install
Westgate
•
3 days
A marble shower enclosure with a concealed thermostatic mixer, rainfall head and handset — no more temperature spikes.
View project
Engineers available 24/7
Boiler Broken Down or Due for Its Annual Service?
Speak directly with a certified heating engineer—no call centres.
